Note: This is a beta release of Red Hat Bugzilla 5.0. The data contained within is a snapshot of the live data so any changes you make will not be reflected in the production Bugzilla. Also email is disabled so feel free to test any aspect of the site that you want. File any problems you find or give feedback here.
Bug 1061688 - Incomplete "rhqct upgrade..." command in the Installation Guide
Summary: Incomplete "rhqct upgrade..." command in the Installation Guide
Keywords:
Status: CLOSED CURRENTRELEASE
Alias: None
Product: JBoss Operations Network
Classification: JBoss
Component: Documentation
Version: JON 3.2
Hardware: Unspecified
OS: Unspecified
unspecified
unspecified
Target Milestone: ---
: JON 3.3.0
Assignee: Deon Ballard
QA Contact: Mike Foley
URL:
Whiteboard:
Depends On:
Blocks:
TreeView+ depends on / blocked
 
Reported: 2014-02-05 12:44 UTC by bkramer
Modified: 2018-12-04 17:19 UTC (History)
0 users

Doc Type: Bug Fix
Doc Text:
Clone Of:
Environment:
Last Closed: 2014-07-29 21:03:24 UTC
Type: Bug


Attachments (Terms of Use)


Links
System ID Priority Status Summary Last Updated
Red Hat Knowledge Base (Solution) 538963 None None None Never

Description bkramer 2014-02-05 12:44:40 UTC
Description of problem:
Chapter 3. Upgrading the JBoss ON Server and Components in Installation Guide (https://access.redhat.com/site/documentation/en-US/Red_Hat_JBoss_Operations_Network/3.2/html/Installation_Guide/managing-servers.html#upgrade-proc) - step 8 states that, in order to upgrade, the following should be executed:

[root@server ~]# ./serverRoot/jon-server-3.2.0.GA/bin/rhqctl upgrade --from-server-dir /opt/rhq/rhq-server-old --from-agent-dir /home/rhq/rhq-agent-old --run-data-migrator

However, --run-data-migrator requires arguments:
* none (do nothing), 
* estimate (estimate the migration time only), 
* print-command (print the command line for a manual run), 
* do-it (run the migration)


Version-Release number of selected component (if applicable):
JBoss ON 3.2

How reproducible:
Always

Steps to Reproduce:
1.
2.
3.

Actual results:
JBoss ON rhqctl will display usage parameters instead to do upgrade. 

Expected results:
The rhqctl upgrade is executed. 

Additional info:

Comment 1 Deon Ballard 2014-07-29 21:03:24 UTC
Mass clsoure from bug fixing in late May.


Note You need to log in before you can comment on or make changes to this bug.